Load balancing lets 40 vans charge on a 400 kVA supply.

The grid upgrade that wasn’t needed

The quote for a new substation came back at eleven months and six figures. Instead, we shared the depot’s existing supply between chargers and let software decide who charges when.

“Every van left fully charged on day one, and we never touched the transformer.”

The results

40

vans charged per night

400 kVA

existing site supply

0

grid upgrades needed

How load balancing decides

01

Vans leaving earliest charge first.

02

Power is capped to stay under the site limit.

03

The dashboard flags any van that won’t be ready in time.

Ready when you are

Plug in.
Power up. Go.

Network live

2,412

chargers online

99.2%

uptime · 30 days

1.84 GWh

delivered today

Network updates

New hubs, price drops and product news. One email a month.

© 2026 Voltra Energy · Template by uilix.co

VoltraVoltra

Ready when you are

Plug in.
Power up. Go.

Network live

2,412

chargers online

99.2%

uptime · 30 days

1.84 GWh

delivered today

Network updates

New hubs, price drops and product news. One email a month.

© 2026 Voltra Energy · Template by uilix.co

VoltraVoltra

Ready when you are

Plug in.
Power up. Go.

Network live

2,412

chargers online

99.2%

uptime · 30 days

1.84 GWh

delivered today

Network updates

New hubs, price drops and product news. One email a month.

© 2026 Voltra Energy · Template by uilix.co

VoltraVoltra

Create a free website with Framer, the website builder loved by startups, designers and agencies.