Load balancing lets 40 vans charge on a 400 kVA supply.
The grid upgrade that wasn’t needed
The quote for a new substation came back at eleven months and six figures. Instead, we shared the depot’s existing supply between chargers and let software decide who charges when.
“Every van left fully charged on day one, and we never touched the transformer.”
The results
40
vans charged per night
400 kVA
existing site supply
0
grid upgrades needed
How load balancing decides
01
Vans leaving earliest charge first.
02
Power is capped to stay under the site limit.
03
The dashboard flags any van that won’t be ready in time.